Home » Experience List

INCINERATOR
1.  PT DONG WOO ENVIRONMENTAL INDONESIA – BEKASI
Service : Fabrication
Waste Type : Hazardous Sludge
Capacity : -
Installed : 2001
2.  RS JIWA PEKANBARU – RIAU
Service : Fabrication
Waste Type : Medical Waste
Capacity : 30 -45 kg/hour
Installed : 2002
3.  PT ANEKA TAMBANG Tbk, POMALAA – SULAWESI TENGGARA
Service : Fabrication
Waste Type : Hazardous Sludge Oil, Hazardous Solid Waste
Capacity : 200 – 250 ltr/hour (Sludge Oil), 135 kg/hour (Solid)
Installed : 2003
4.  PT REKAYASA HIJAU INDONESIA, BANDUNG – JAWA BARAT
Service : Fabrication
Waste Type : Medical Waste
Capacity : 50 – 75 kg/hour
Installed : 2004
Emission Test : Test by SUCOFINDO No. 3435674   *)
5.  PT DESA AIR CARGO, BATAM – KEPULAUAN RIAU
Service : Fabrication
Waste Type : Hazardous Solid Waste
Capacity : 350 – 400 kg/hour
Installed : 2004
Emission Test : Test by CORE LAB No. 205064   *)
6.  RSUD PAYAKUMBUH – SUMATERA BARAT
Service : Fabrication
Waste Type : Medical Waste
Capacity : 50 – 75 kg/hour
Installed : 2004
7.  RSUD M. YUNUS – BENGKULU
Service : Fabrication
Waste Type : Medical Waste
Capacity : 10 – 20 kg/hour
Installed : 2005
8.  RS JIWA – BENGKULU
Service : Fabrication
Waste Type : Medical Waste
Capacity : 10 – 20 kg/hour
Installed : 2005
9.  RSUD PADANG PANJANG – SUMATERA BARAT
Service : Fabrication
Waste Type : Medical Waste
Capacity : 10 – 20 kg/hour
Installed : 2006
10. PT KRAMAYUDHA RATU MOTOR – JAKARTA TIMUR
Service : Fabrication
Waste Type : Hazardous Solid Waste
Capacity : 125 kg/hour
Installed : 2006
11. PT BUANA MULTI INSTRUMENDO
Service : Design & Fabrication
Waste Type : Hazardous Solid Waste
Capacity : 30-50 kg/hour
Installed : 2007
12. PT PASADENA METRIC INDONESIA
Service : Design & Fabrication
Type : Spent Catalyst Recovery
Equipment : Static Incinerator, Direct & Indirect Rotary Kiln Incinerator,
  2nd Chamber, Cyclone Dust Collector & Ventury Wet Scruber
Capacity : 50 Ton/month
Installed : 2007
13. PT DESA AIR CARGO BATAM
Service : Design & Fabrication
Type : Industrial Waste
Equipment : Reciprocating  Incinerator,
  2nd Chamber, Cyclone Dust Collector & Ventury Wet Scruber
Capacity : 1Ton/Hour continues
Installed : 2007
14. RSUD MUKO-MUKO (BENGKULU)
Service : Design & Fabrication
Type : Medical Waste
Equipment : Static Incinerator, Retort System
Capacity : 10-20 Kg/Hour
Installed : 2007
15. RSUD CIAMIS
Service : Design & Fabrication
Type : Medical Waste
Equipment : Static Incinerator, Retort System
Capacity : 10-20 Kg/Hour
Installed : 2008
16. KEMENTRIAN LINGKUNGAN HIDUP (KLH)
Service : Design & Fabrication
Type : Industrial Waste
Equipment : Reciprocating  Incinerator,
  2nd Chamber, Cyclone Dust Collector & Ventury Wet Scruber
Capacity : 350 Kg/Hour continues
Installed : 2009
17. PT. TENANG JAYA SEJAHTERA (Pengelola Limbah B3 – Karawang, Jawa Barat)
Service : Design & Fabrication
Type : Industrial Waste
Equipment : Reciprocating  Incinerator
Capacity : 300 Kg/Hour continues
Installed : 2010
18. PT. PUTRA RESTU IBU ABADI (Pengelola Limbah B3, Mojokerto, Jawa Timur)
Service : Design & Fabrication
Type : Industrial Waste
Equipment : Reciprocating  Incinerator
Capacity : 300 Kg/Hour continues
Installed : 2012
19. PT. LOGAM JAYA ABADI  (Pengelola Limbah B3, Bekasi,  Jawa  Barat)
Service : Design & Fabrication
Type : Industrial Waste
Equipment : Reciprocating  Incinerator
Capacity : 100 Kg/Hour continues
Installed : 2012
20. PETROCHINA BERMUDA Ltd  (Perusahan Migas – Sorong, papua)
Service : Design & Fabrication
Type : Industrial Waste
Equipment : Reciprocating  Incinerator
Capacity : 100 Kg/Hour continues
Installed : 2012
21. PT. PUPUK ISKANDAR MUDA (Leuksumawe, Aceh Utara)
Service : Design & Fabrication
Type : Fertilizer Plant
Equipment : Reciprocating  Incinerator
Capacity : 100 Kg/Hour continues
Installed : 2012

 

 

Note : *)  Emission Quality Meet to Government Regulation (Kep. 03/Bapedal/09/1995).

 

OTHER PROCESS EQUIPMENT
22. LIPI SUBANG – JAWA BARAT
Service : Fabrication
Equipment : Filter Press
Chamber Capacity : 75 litre
Installed : 2002
23. CV WISKA, BANDUNG – JAWA BARAT
Service : Fabrication
Equipment : Filter Press
Chamber Capacity : 250 litre
Installed : 2003
24. PT ABADI NUSA, BANDUNG – JAWA BARAT
Service : Fabrication
Equipment : Cabinet Dryer for Rubber
Capacity : 2 ton/cycle
Installed : 2004
25. PT SUGIH INSTRUMENDO ABADI, BANDUNG – JAWA BARAT
Service : Fabrication
Equipment : Cabinet Dryer for Rubber
Capacity : 2 ton/cycle
Installed : 2004
26. PT SISKEM ANEKA INDONESIA
Service : Fabrication
Equipment : Filter Press
Camber Capacity : 200 litre
Installed : 2007
27. PT . BUANA  MULTI  TECHINDO
Service : Fabrication
Equipment : LPG 3kg Anealing Furnace
Installed : 2007
 28. PT. DESA AIR CARGO BATAM
Service : Fabrication
Equipment : Electro Coagulant Waste Water Treatment
Capacity : 400 litre
Installed : 2010
29. PT. TENANG JAYA SEJAHTERA KARAWANG
Service : Fabrication
Equipment : Electro Coagulant Waste Water Treatment
Capacity : 400 litre
Installed : 2010
30. PT. SANYO JAYA COMPONENTS
Service : Fabrication
Equipment : Electro Coagulant Waste Water Treatment
Capacity : 400 M3/DAY
Installed : 2014
31. PT. FUTAMI FOOD
Service : Fabrication
Equipment : Electro Coagulant Waste Water Treatment
Capacity : 200 M3/DAY
Installed : 2014

 

32. PT. MINDA ASEAN AUTOMOTIVE
Service : Over Haull
Equipment : Electric Furnace
Capacity : 27 Kwh
Installed : 2010

 

 

GENERAL MECHANIC
 31. LIPI SUBANG – JAWA BARAT
Service : Fabrication
Equipment : Pressing Equipment
Installed : 2002
32. LIPI SUBANG – JAWA BARAT
Service : Fabrication
Equipment : Pressing Equipment
Installed : 2003
33. WEDA BAY NICKEL
Service : Fabrication
Equipment : Fuel Tank Facility
Installed : 2009
34. PT. DESA AIR CARGO BATAM
Service : Fabrication
Equipment : Crusher for PCB (printed circuit board)
Installed : 2009
 35. PT. DESA AIR CARGO BATAM
Service : Fabrication
Equipment : Shredder Machine
Installed : 2009
 36. PT. DESA AIR CARGO BATAM
     Service                               : Fabrication
Equipment                               : Filter Press
Installed                               : 2010

 

 Recent Usage of Clock Spring in Oil and Gas Industries in Indonesia

April 2009 Clock Spring Composite Sleeve Installation of 28 inch Pipeline Reinforcement at KP  455 – PT Transportasi Gas Indonesia (TGI),Perawang – Pekanbaru, Riau
May 2010 Clock Spring Composite Sleeve Installation of 8 inch High Temp Riser – PT Total E & P Indonesie, Mahakam Delta, Balikpapan, East Kalimantan
Nov 2010 Clock Spring Composite Sleeve Installation  of 8 inch High Temp Pipeline at KP 74 – PT Total E & P Indonesie, Balikpapan, East Kalimantan
Jan 2011 Clock Spring Crack Arrestor Installation at 12 inch Sales Gas Pipeline from Singa to Pagardewa Station – PT Medco Energy, Lematang Asset,  South Sumatera
Jan 2011 Clock Spring – Girth Weld Reinforcement at 12 inch Sales Gas Pipeline at Tanjung Santan LPG Terminal, PT Chevron Indonesia Company (CICO),East Kalimantan
Feb 2011 Clock Spring Composite Sleeve Installation of 32 inch High Pressure Gas Transmission Line Reinforcement Project – PT Perusahaan Gas Negara (PGN) Trans Sumatera Jawa (TSJ) KP 68+500, Belitang – Oku Timur,South Sumatera
Apr 2011 Clock Spring – Contour Composite Wraps Installation  of 18 inch Insulating Joint Repair Project – PT Perusahaan Gas Negara (PGN) – SBU 2,Surabaya, East Java
May 2011 Clock Spring Composite Sleeve Installation  of 36 inch Caisson Leak Repair and Reinforcement Project – Star Energy Kakap Limited (SEKL) – KG Platform, Natuna Offshore, Sumatera
Jun 2011 Clock Spring Composite Sleeve Installation  of 32 inch High Pressure Gas Transmission Line Reinforcement Project – PT Perusahaan Gas Negara (PGN) Trans Sumatera Jawa, KP 121, Lampung – Sumatera
Jun 2011 Clock Spring Composite Sleeve Installation  of 28 inch High Pressure Gas Transmission Line Pipeline Reinforcement – PT Transportasi Gas Indonesia (TGI), Grissik – Duri Line at KP 127, Sakernan, Jambi
Jul 2011 Clock Spring – Snap Wrap Composite Sleeve Installation  of 8 inch High Temp Riser and 42 inch Skim Pile Leak Repair and Reinforcement Project – PT Pertalahan Arnebatara Natuna (PAN), Natuna Offshore, Sumatera
Jul 2011 Clock Spring Composite Sleeve Installation  of 32 inch High Pressure Gas Transmission Line Reinforcement Project PT Perusahaan Gas Negara (PGN) Trans Sumatera Jawa, KP 0+300, Pagardewa Station – South Sumatera
Sep 2011 Clock Spring Composite Sleeve Installation  of 10 inch High Pressure Gas Line, Leak Repair and Reinforcement Project at Baru Gas Plant KP 14.500,PT Kalila Energy Indonesia, Pekanbaru, Riau – Sumatera
Oct 2011 Clock Spring Composite Sleeve Installation  of 32 inch High Pressure Gas Transmission Line Reinforcement Project – PT Perusahaan Gas Negara (PGN) Trans Sumatera Jawa, KP 96, Lampung – Sumatera
Nov 2011 Clock Spring Composite Sleeve Installation  of 20 inch High Temperature Line Reinforcement Project – Chevron Pacific Indonesia (CPI), Petani Pematang Bekasap Line, Riau – Sumatera
Jan 2012 Clock Spring – Pipe Support Composite Sleeve Installation of 6 inch Condensate Line Repair Project – Salamander Energy, Pangkalan Brandan,Sumatera Utara
Jan 2012 Clock Spring – Girth Weld Reinforcement at 8 inch Subhan Grissik Pipeline at KP 34-132, Conoco Phillips Indonesia (COPI), Jambi – Sumatera
Feb 2012 Clock Spring Contour Wet Resin System Installation Supervision, Pertamina RU 4 Cilacap, 3 inch Elbow Repair at UP 4 Area, Cilacap – Central Java
Mar 2012 Clock Spring Contour Installation Supervision at 6 inch Fire Water Line System, PT Chandra Asri Petrochemical, Cilegon – Banten
Apr 2012 Clock Spring Composite Sleeve Installation and Supervision of 12 inch Fuel Line Reinforcement Project at PT Vale Inco, Sorowako – Sulawesi
Jun 2012 Clock Spring Composite Sleeve Installation at Conoco Phillips Indonesia (Offshore), Belida Platform 8 inch Riser Repair Project, Natuna Offshore – Sumatera
Jul 2012 Clock Spring Composite Sleeve Installation and Supervision of 18 inch High Pressure Gas Transmission Line Reinforcement Project at PT Pertamina Gas, Pangkalan Brandan-Wampu Pipeline, P. Brandan – North Sumatera
Jul 2012 Clock Spring Snap Wrap Installation Supervision, PT PGN SBU 2 Surabaya– Flyover Waru Bridge Reinforcement Project, Surabaya – East Java
Aug 2012 Clock Spring Contour Installation Supervision, PT PGN SBU 2 Surabaya – Pasuruan Pipeline Reinforcement Project, Surabaya – East Java
Sept 2012 Clock Spring Composite Sleeve Installation and Supervision of 12 inch Fuel Line Reinforcement Project at PT Vale Inco, Sorowako – Sulawesi
Oct 2012 Clock Spring Composite Sleeve Installation at Conoco Phillips Indonesia (Offshore), Belida Platform 12 inch Riser Repair Project, Natuna Offshore – Sumatera
Nov 2012 Clock Spring Composite Sleeve Installation  of 28 inch High Pressure Gas Transmission Line Pipeline Reinforcement – PT Transportasi Gas Indonesia (TGI), Grissik – Duri Line, Sakernan, Jambi
Nov 2012 Clock Spring Composite Sleeve Installation and Supervision of High Pressure Gas Transmission Line Reinforcement Project at PT Pertamina Gas, Prabumulih – Plaju Pipeline – South Sumatera
Dec 2012 Clock Spring – Contour Composite Wraps Installation  of 16 inch Pipeline Gas Distribution – Elbow Repair Project – PT Perusahaan Gas Negara (PGN) – SBU 3,Medan, North Sumatera

 

Share This: